EN 12350-1 PDF

DRAFT. prEN August ICS Will supersede EN English Version. Testing fresh concrete – Part 1: Sampling and common. EUROPEAN STANDARD FINAL DRAFT NORME EUROPÉENNE prEN EUROPÄISCHE NORM June ICS Will supersede EN. BS EN Testing fresh concrete. Sampling (British Standard) This European Standard specifies two procedures for sampling fresh concrete by.

Author: Mazull Shaktigor
Country: Brunei Darussalam
Language: English (Spanish)
Genre: Business
Published (Last): 26 December 2010
Pages: 134
PDF File Size: 15.14 Mb
ePub File Size: 11.22 Mb
ISBN: 521-3-97014-546-5
Downloads: 39434
Price: Free* [*Free Regsitration Required]
Uploader: Kazikazahn

NOTE The requirement for remixing the sample before tests on the fresh concrete, or before making test specimens, is included in the relevant standards. Contents of BS EN This British Standard specifies two procedures for sampling fresh concrete which are implemented by composite sampling and by spot sampling.

Records shall be kept to ensure the traceability of the specimen from sampling to testing. To find out more, including how to control cookies, see here: Report from the sample includes: Your basket is empty.

NOTE The properties of fresh concrete change with time after mixing, depending upon the environmental conditions.

BS EN 12350-1:2009

E worldwide for CEN national Members. The time for this to occur depends on the concrete temperature, cement type, mix proportions, the use of admixtures with set retarding properties and consistency of the concrete.

After compaction of each layer, tap the sides of the container smartly with the mallet until large bubbles of air cease to appear on the surface and depressions left by the compacting rod or bar, are removed. The report may include: Self-compacting concrete – V-funnel test in preparation ; Part Degree of compactability; Part 5: Log In Sign Up.

Significance and Use Provides standardized requirements for making, curing, protecting and transporting concrete specimens. The vertical distance between the height of the mould and the highest point is measured and recorded as the slump in mm.

  IMM 5419 FRANCAIS PDF

Thank you for another wonderful post. For this to occur the delay should be 123550-1 for the lower layer to develop an initial set or harden. This should be taken into account in deciding the time when tests are carried out or specimens made. Pressure methods BS EN Email required Address never made public.

See more standards on testing concrete. Ideally placing subsequent layers of fresh concrete should be undertaken as soon as practical to enable a fully compacted and monolithic element. Avoid over-vibration, which may cause loss of entrained air. When sampling from a falling stream, take the increments in such a way as to represent the whole width and thickness of the stream. Strike off the mold with the tamping rod in a screeding and rolling rn Remove concrete from the area surrounding the base to prevent interference with the movement of slumping concrete.

As the load is discharged, sampling should be taken from the whole width and depth not just the top part. Record the date and time of sampling.

Scope This practice specifies methods for making and curing test specimens for strength tests. This is a very classical question raised by many rn engineers. A version in any other language made by translation under the responsibility een a CEN member into its own language and notified to the CEN Management Centre has the same status as the official versions.

Take the scoopfuls of concrete through the moving stream from the truck mixer. You are commenting using your Facebook account. You can download and open this file to your own computer but DRM prevents opening this file on another computer, including a networked server.

Testing fresh concrete -Part 1: Sampling | Daniel Stănică –

We enn no amendments or corrections for this standard. Worldwide Standards We can source any standard from anywhere in the world. There is often debate about the time limit between placing fresh concrete against fresh concrete already placed and compacted i. Where required, the specification of a maximum time between placing layers of concrete should take account of the likely temperature of the concrete, cement type, mix proportions, the use of admixtures with set retarding properties and consistency of the concrete.

  EGIPATSKA RELIGIJA PDF

Take the smart route to manage medical device compliance. This will cause the delay of pouring and worst the rejection of other concrete truck loads because of the temperature overdue. Add to Alert PDF. Testing 1230-1 concrete -Part 1: Mechanical vibration using Compacting with an internal vibrator Apply the vibration for the minimum duration necessary to achieve full compaction of the concrete.

Please first log in with a verified email before subscribing to alerts. Metallic, Frustum of a cone Alternative materials are allowed if requirements are met comparability tests Tamping Rod Round, straight steel rod, length mm and diameter 16mm Tamping end rounded to a hemispherical tip Measuring Device Ruler Marked in increments of 5 mm or smaller Length of at least mm In addition, a scoop is needed.

Pack the hardened test specimens in wet sand or wet sawdust or wet cloths wet burlapor sealed in plastic bags containing water. Wash wet concrete off the skin immediately. Vebe test; Part 4: 1235-01 are commenting using your Twitter account. Using the scoop take the increment s from the required part of a batch or mass of concrete.

The report shall include: These limits are sufficient for wn UK temperatures. Prevent skin contact with wet cement or concrete by wearing suitable protective clothing. This European Standard specifies two procedures for sampling fresh concrete, by composite sampling and by spot sampling.

VPN